Restoring Critical Jacking System Integrity

1. Introduction: The Challenge
The jacking and skidding system of a drilling rig is its backbone—critical for stability, mobility, and safe operation. When its reliability is compromised, the entire rig’s functionality and safety come under threat.
The Problem: A prior inspection of the LeTourneau-designed skidding system revealed multiple critical issues, from worn-out bearings to corroded case structures and hidden cracks in vital gears. These posed serious risks of failure and downtime.
The Solution Provider: Formura Offshore Services was entrusted with executing a comprehensive remedial project—an overhaul of all four drive units—to restore system integrity in line with OEM standards.
2. Project Scope & Objectives
The project was defined under a clear mandate: overhaul and remediate all four skidding units of the rig, ensuring complete compliance with OEM specifications.
Units Covered:
- Starboard (STBD) Aft Unit
- Starboard (STBD) Forward Unit
- Port (PORT) Aft Unit
- Port (PORT) Forward Unit
Objectives:
- Overhaul the Primary, Secondary, and Final Drive systems of each unit.
- Replace or repair failed and degraded components.
- Ensure the refurbished system meets OEM requirements for safe and reliable operations.
3. Key Challenges & Solutions
Challenge 1 – Unexpected Failures
Seized gearbox and cracked rack pinion required urgent solutions.
Solution: Flexible project management and efficient use of spares enabled timely recovery.
Challenge 2 – Corrosion & Structural Degradation
Severe corrosion across case structures.
Solution: Skilled welding repairs and protective coating restored integrity without full replacement.
Challenge 3 – Ensuring Long-Term Reliability
Need to ensure safety beyond immediate repair.
Solution: Comprehensive MPI testing ensured only structurally sound parts were retained.
4. Project Results & Conclusion
Results Delivered:
- Prevented Catastrophic Failure: Cracked pinion and seized gearbox were remediated before causing downtime.
- Extended System Lifespan: Overhaul significantly extended operational life of skidding units.
- Restored OEM Compliance: Units reassembled and tested to OEM standards, ensuring safe rig operations.
Conclusion
Formura Offshore Services successfully executed a complex jacking system remedial project under challenging conditions. By combining technical expertise, OEM-aligned practices, and flexible project management, Formura reinforced its position as a trusted partner for offshore asset integrity and operational continuity.